Online Contractor Induction www.colesgroup.com.au www.colesgroup.com.au www.colesgroup.com.au www.colesgroup.com.au
  Contractor Safety Home   |   Contact Us   |   Search   |     Online Contractor Induction     
Add to Favourites  
  
Online Contractor Induction

   FAQ Induction
   Search Induction Number
   Head Contractor Information Pack
   Safety Policy
   Coles Group Inductions
   Signing in on arrival at Store/Site
   Safe Work Method Statement (SWMS)
   Health and Safety Management Plans
   Work permits
   Contractor spotchecks
   Corrective Action report
   Chemicals and MSDSs
   Plant and Equipment
   Scheduling of works
   Asbestos Register
   Incident management
   OH&S Obligations
   Prequalification process
   Special Requirements
   Working from Heights
   Electrical Safety
   Ceiling Space Access
   Traffic Management and Mobile Phones
   Transport and Delivery Drivers
   Contractor Audits
   Manual Handling
  

Working at Heights

  • Where possible, the need to work from heights should be eliminated.
  • Approved height protection control measures must be implemented based on risk (safety harness, scaffolding, etc). Relevant equipment must be provided by the Contractor.
  • The Contractor must ensure that its Personnel have received appropriate training in the correct use of equipment, including fall arrest equipment.

Ladders

  • Metal / aluminium ladders shall not be used anywhere electrical hazard exists (voltages in excess of 50 volts AC or 120 volts DC)
  • Ladders must comply with relevant Australian Standards and be in good condition. The Contractor must inspect ladders prior to use.
  • The Contractor must ensure that its Personnel are trained in safe work practices in relation to ladders.

Scaffolds

  • All scaffolding used on site must comply with relevant laws and Australian Standards.
  • All scaffolding must be assembled by trained and licensed Personnel.